2014 |
Termokimik |
Nigeria - Dangote |
Cost estimation and dimensioning for Biological Plant |
2015 |
ENI - Syndial |
Italy - Priolo Gargallo (SR) |
Technical report, calculations and time schedule for new barrier wells |
2015 |
ENI - Syndial |
Italy - Crotone (KR) |
Verification of the IMPEG Project for Groundwater Remediation |
2015 |
ENI - Syndial |
Italy - Val d’Agri (PZ) |
Cost estimation for Production Water treatment plant |
2016 |
ENI - Syndial |
Italy - Brindisi (BR) |
Study for the addition of one dual media filter in the groundwater treatment plant |
2016 |
ENI - Syndial |
Italy - Assemini (CA) |
Report for testing procedures and analysis of corrosion problems of the Off Gas System |
2016 |
Saras |
Italy - Sarroch (CA) |
Estimate for the construction of the new control room of the North Plant |
2016 |
ENI - Syndial |
Italy - Sarroch (CA) |
Study for optimizing emergency safety systems |
2016 |
ENI - Syndial |
Italy - Ferrara (FE) |
Design verification for the hazardous and non-hazardous waste platform |
2017 |
ENI - Syndial |
Italy - Val d’Agri (PZ) |
Feasibility study for the new BWI Production Water system |
2017 |
ENI - Syndial |
Italy - Brindisi (BR) |
FEED for the groundwater pretreatment plant |
2017 |
ENI - Syndial |
Italy - Porto Torres (SS) |
Study for the remote management of groundwater treatment plants 1, 2 and 3 |
2017 |
ENI - Syndial |
Italy - Pieve Vergonte (VB) |
Technical report and calculations for the installation of barrier wells - Interconnecting phase 1 |
2018 |
ENI - Syndial |
Italy - Val d'Agri (PZ) |
Material balance of the Production Water plant |
2018 |
KCO |
Kazakhstan - Karachaganak |
Engineering study for the Karachaganak Expansion Project New Water Treatment Unit |
2018 |
ENI Congo |
Congo - Pointe-Noire |
Process engineering for the Zatchi Zero Water Discharge project |
2018 |
ENI I.L.C.V. |
Italy - Assemini (CA) |
Process engineering for water discharges at the Luigi Conti Vecchi plant in Macchiareddu |
2018 |
ENI - Syndial |
Italy - Sarroch (CA) |
FEED of the Groundwater Treatment plant |
2018 |
ENI - Syndial |
Italy - Fano (PU) |
Drafting of design specifications |
2018 |
ENI - Syndial |
Italy - Gela (CL) |
Process report of the secondary clarifier by-pass in the municipal line of the Biological plant |
2019 |
ENI - Syndial |
Italy - Val d'Agri (PZ) |
Cost estimations for the Production Water plant |
2019 |
ENI - Syndial |
Italy - Manfredonia (FG) |
Analysis and validation of the expansion and optimization project of the Groundwater Treatment plant |
2019 |
ENI - Syndial |
Italy - Assemini (CA) |
Study of the segregation of drains for sending to Tecnocasic |
2019 |
ENI Rewind |
Italy - Mantova (MN) |
Analysis and validation of the Interconnection project |
2020 |
ENI Rewind |
Italy - Assemini (CA) |
Validation of the extraordinary maintenance of the Groundwater Treatment system |
2020 |
ENI Rewind |
Italy - Gela (CL) |
Process engineering for the tank drainage system of the Waste Water Treatment plant |
2020 |
ENI Rewind |
Italy - Priolo Gargallo (SR) |
Study for the steam generator of the Priolo Laboratory |
2020 |
ENI Rewind |
Italy - Manfredonia (FG) |
Safety and Environment Critical Elements report |
2020 |
ENI Rewind |
Italy - Gela (CL) |
Specification for the adjustment of sample sockets |
2020 |
ENI Rewind |
Italy - Gela (CL) |
Verification of fouling in the groundwater supply network to Groundwater Treatment plant |
2020 |
ENI Rewind |
Italy - Gela (CL) |
Adaptation of air collectors of barrier wells |
2021 |
ENI Rewind |
Italy - Porto Torres (SS) |
FEED of the package for azelaic acid dissolution in alcohol |
2021 |
ENI Rewind |
Italy - Portovesme (SU) |
Casting cooling system process |
2021 |
ENI Rewind |
Italy - Gela (CL) |
Electrical specification of the Waste to Fuel plant |
2021 |
ENI Rewind |
Italy - Portovesme (SU) |
Executive design of the casting cooling system |
2021 |
ENI Rewind |
Italy - Gela (CL) |
New compressed air production unit |
2022 |
ENI Rewind |
Italy - Porto Torres (SS) |
Process verification of Groundwater Treatment tanks vents |